VAK Russia 2.1.7 UDC 69.05 VAK Russia 2.1.14

FEATURES OF SELECTING ORGANIZATIONAL AND TECHNOLOGICAL SOLUTIONS FOR THE RECONSTRUCTION OF CAPITAL CONSTRUCTION PROJECTS IN POST-WAR TERRITORIES. Features of selecting organizational and technological solutions for the reconstruction of capital construction projects in post-war territories.

Published in Construction production · Issue 1, 2026 · ELocator: CP0039 · Rubric: Original articles
DOI: https://doi.org/10.29039/2658-5340-2026-1-CP0039 · EDN: CHCYAZ
Received: 22.01.2026 Accepted: 15.02.2026 Published: 30.03.2026 Language of publication: ru-RU
Contemporary conditions for the reconstruction of capital construction projects in post-war territories of the Russian Federation demand fundamentally new approaches to construction project management. Standard organizational and technological solutions developed for peacetime fail to account for the specificities of the post-conflict environment: unstable security conditions, destroyed infrastructure, resource shortages, legal uncertainty, and the high variability in the extent of building damage. As a result, restoration efforts often remain fragmented and poorly coordinated, reducing their effectiveness and delaying the population’s return to normal life.This article substantiates the need to implement a Composite Quality Indicator (CQI) as a tool for objective evaluation and selection of optimal organizational and technological solutions (OTS). Based on the analysis of experience from implementing approximately 3,000 projects and a survey of 75 experts involved in the restoration program, 39 initial factors affecting construction operations were identified. Through statistical ranking by frequency of mention, a core set of 22 key determinants was established and proposed as the foundation for developing the CQI. The study lays the methodological groundwork for an adaptive restoration management system capable of balancing safety, timelines, cost, and the social significance of construction projects under conditions of extreme uncertainty.
post-conflict reconstruction, organizational and technological solutions, composite quality indicator, determinants of construction production, reunified territories, risk management, construction projects
Text References

1. O sostoyanii zashhity naseleniya i territorij Rossijskoj Federatsii ot chrezvychajnykh situatsij prirodnogo i tekhnogennogo kharaktera v 2024 godu Gosudarstvennyj doklad : gosudarstvennyj doklad [versiya s QR-kodami] [State Report on the state of protection of the population and territories of the Russian Federation from natural and man- made emergencies in 2024 : State report [QR-coded version]] / Ministerstvo Rossijskoj Federatsii po delam grazhdanskoj oborony, chrezvychajnym situatsiyam i likvidatsii posledstvij stikhijnykh bedstvij [The Ministry of the Russian Federation for Civil Defense, Emergency Situations and Elimination of Consequences of Natural Disasters]. – Moscow : MCHS Media [Ministry of Emergency Situations Media], 2025. – 272 p.

2. Lapidus, A. A. Potentsial ehffektivnosti organizatsionno-tekhnologicheskikh reshenij stroitel`nogo obekta [Efficiency Potential of Management and Technical Solutions for a Construction Object] / A. A. Lapidus // Vestnik MGSU [Bulletin of MGSU]. – 2014. – No 1. – P. 175–180 DOI: https://doi.org/10.22227/1997-0935.2014.1.175-180; EDN: https://elibrary.ru/RTUKMV

3. Virtsev, M. Y. Optimizatsiya zatrat pri vypolnenii rekonstruktsii zhilykh zdanij [Cost optimization during the reconstruction of residential buildings] / M. Y. Virtsev // ZHilishhnye strategii [Housing strategies]. – 2025. – No. 1. – Pp. 89–99. – URL: https://cyberleninka.ru/article/n/optimizatsiya-zatrat-pri-vypolnenii-rekonstruktsii-zhilyh-zdaniy DOI: https://doi.org/10.18334/zhs.12.1.121660; EDN: https://elibrary.ru/EDOGBL

4. Avtomatizatsiya zhiznennogo tsikla zdanij pri rekonstruktsii i kapital'nom remonte [Automation of the life cycle of buildings during reconstruction and major repairs] / V. I. Rimshin, I. L. Shubin, V. T.Yerofeyev, A. A. Avetisyan.– DOIhttps://doi.org/10.31659/0044-4472-2022-7-6-12 // Zhilishhnoe stroitel'stvo [Housing construction]. – 2022. – No. 7. – Pp. 6–12. EDN: https://elibrary.ru/LIMAVP

5. Fulaih, N. S. Q. Assessment and Repair of Damaged Concrete Structures due to War Case study (The Republic of Yemen) / N. S. Q. Fulaih, A. H. M. Ali // International Journal of Engineering Research & Technology (IJERT). – 2022. – Vol. 11, Iss. 01. – P. 49–62.

6. Khadour, L. A. Multi-criteria Strategic Framework for Improving Residential Buildings Operational Energy Efficiency (Case Study Damascus Residential Youth Buildings) / L. A. Khadour // Damascus University Journal of Engineering Sciences. – 2020.– No 36. – P. 57–72.

7. Vorobyev, D. S. Tekhnicheskaya otsenka zdanij i sooruzhenij: uchebnoye posobiye [Technical assessment of buildings and structures] / D. S. Vorobyev ; M-vo obrazovaniya i nauki Ros. Federatsii. Volgogr. gos. arkhit.-stroit. un-t [Ministry of Education and Science of the Russian Federation, Volgograd State University of Architecture and Civil Engineering].– Volgograd : VolgGASU, 2015. – 53 p.

8. Lapidus, A. A. Issledovanie kompleksnogo pokazatelya kachestva vypolneniya rabot pri vozvedenii stroitelnogo obekta [The study of the integrated indicator the quality of work at construction of the object] / A. A. Lapidus, Y. V. Shesterikova // Sovremennaya nauka i innovatsii [Modern science and innovation]. – 2017. – No 3 (19). – P. 128–132. EDN: https://elibrary.ru/YOVVSA

9. Lapidus, A. A. Developing administrative and process-related solutions for the benefit of residential construction projects / A. A. Lapidus, T. K. Kuzmina, P. V. Bolshakova. – DOIhttps://doi.org/10.58224/2618-7183-2024-7-6-2 // Construction Materials and Products. – 2024. – Vol. 7, Iss. 6. – Art. 2. EDN: https://elibrary.ru/FSJMWB

10. Lapidus, A. A. Formirovanie integralnogo potentsiala organizatsionno-tekhnologicheskikh reshenij posredstvom dekom-pozitsii osnovnykh elementov stroitel’nogo proekta [Formation of the integral potential of organizational and technological solutions through the decomposition of the main elements of a construction project] / A. A. Lapidus // Vestnik MGSU [Bulletin of MGSU]. – 2016. – No 12. – P. 114–123. DOI: https://doi.org/10.22227/1997-0935.2016.12.114-123; EDN: https://elibrary.ru/XEJGON