1. Parsamehr, M., Perera, U.S., Dodanwala, T.C. et al. A review of construction management challenges and BIM-based solutions: perspectives from the schedule, cost, quality, and safety management / M. Parsamehr, U.S. Perera, T.C. Dodanwala et al. // Asian J Civ Eng. -2023. – Vol. 24 – P. 353–389 – URL: https://doi.org/10.1007/s42107-022-00501-4 EDN: https://elibrary.ru/PJYEUX
2. Shehab, A., Abdelalim, A. M. Utilization BIM for Integrating Cost Estimation and Cost Control Using BIM in Construction Projects / A. Shehab, A. M. Abdelalim // International Journal of Management and Commerce Innovations – 2023. - Vol. 11, Iss. 1. – P.102-120. – URL: https://www.researchgate.net/publication/370682454
3. Sepasgozar, S.M.E., Khan, A.A., Smith, K., Romero, J.G., X. Shen, S. Shirowzhan, H. Li, F. Tahmasebinia BIM and Digital Twin for Developing Convergence Technologies as Future of Digital Construction / S.M.E. Sepasgozar, A.A. Khan, K. Smith, J.G. Romero, X. Shen, S. Shirowzhan, H. Li, F. Tahmasebinia // Buildings. – 2023. – Vol. 13. – P. 441 - 445. – URL: https://doi.org/10.3390/buildings13020441 EDN: https://elibrary.ru/DUISGZ
4. Kabanov, V. Information model of the construction process in space and time / V. Kabanov // E3S Web of Conferences. – 2021. – Vol. - 258, 09008. – URL: https://doi.org/10.1051/e3sconf/202125809008 EDN: https://elibrary.ru/UNBBQG
5. Traore, M. , Zhao, G., Zhou, X. Simulation of the Construction of a Swivel Bridge Using BIM 4D / M. Traore, G. Zhao, X. Zhou // Open Journal of Civil Engineering. – 2023. – Vol. 13. – P. 139-154. – URL: doi:https://doi.org/10.4236/ojce.2023.131010. EDN: https://elibrary.ru/EGYJOY
6. Mikhaylova, E.V. Optimization of Calendar Plan Based on the Use of Gini Coefficient / E.V. Mikhaylova // AIP Conference Proceedings. – 2022. - Vol. 2559, 060005. – URL: https://doi.org/10.1063/5.0099089
7. Mahmoudi, A., Javed, S A. Performance Evaluation of Construction Sub contractors using Ordinal Priority Approach / A. Mahmoudi, S A. Javed // Evaluation and Program Planning. – 2022. - Vol. 91, 102022. – URL: https://doi.org/10.1016/j.evalprogplan.2021.102022 EDN: https://elibrary.ru/SGRPBR
8. Supratman, R., Dinariana, D., Nurjaman, H.N., Jayady, A., Suryani, F. Stress factors of labor construction of building construction on performance time and cost / R. Supratman, D. Dinariana, H.N. Nurjaman,, A. Jayady, F. Suryani // Indonesian Journal of Multidisciplinary Science. – 2022. – Vol. 1, Iss. 7. – URL: https://doi.org/10.55324/ijoms.v1i7.126 EDN: https://elibrary.ru/ZSFMQT
9. Cheraghi, E., Zohrehvandi, S., Vanhoucke, M., Mohamadpour Tosarkani, B. A multiproject scheduling and resource management model in projects construction / E. Cheraghi, S. Zohrehvandi, M. Vanhoucke, B. Mohamadpour Tosarkani // Engineering, Construction and Architectural Management. – 2023. – Vol. 30. Iss. 4. – P. 1578-1600. – URL: https://doi.org/10.1108/ECAM-02-2021-0177 EDN: https://elibrary.ru/ISQAYZ
10. Jiang, C., Li, X., Lin, J-R., Liu, M., Ma, Z. Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning / C. Jiang, X. Li, J-R. Lin, M. Liu, Z. Ma // Automation in Construction. – 2023. – Vol. 150, 104817. – URL: https://doi.org/10.1016/j.autcon.2023.104817. EDN: https://elibrary.ru/OIVZQK
11. Nguyen, D-T., Le-Hoai, L., Tarigan, P. B., Tran, D-H. Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm / D-T. Nguyen, L. Le-Hoai, P. B. Tarigan, D-H. Tran // Alexandria Engineering Journal. – 2022. – Vol. 61, Iss. 2. – P. 1499-1518. – URL: https://doi.org/10.1016/j.aej.2021.06.058. EDN: https://elibrary.ru/ECNDSI
12. Annamalaisami, C. D., Kuppuswamy, A. Reckoning construction cost overruns in building projects through methodological consequences / C. D. Annamalaisami, A. Kuppuswamy // International Journal of Construction Management. – 2022. – Vol. 22:6. – P. 1079-1089. – URL: DOI:https://doi.org/10.1080/15623599.2019.1683689
13. Alshboul, O., Shehadeh, A., Almasabha, G., Almuflih, A.S. Extreme Gradient Boosting-Based Machine Learning Approach for Green Building Cost Prediction / O. Alshboul, A. Shehadeh, G. Almasabha, A.S. Almuflih // Sustainability. – 2022. – Vol. 14, 6651. – URL: https://doi.org/10.3390/su14116651 EDN: https://elibrary.ru/ZLZMVI
14. Shoar, S., Yiu, T.W., Payan, S., Parchamijalal, M. Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective / S. Shoar, T.W. Yiu, S. Payan, M. Parchamijalal // Engineering, Construction and Architectural Management. – 2023. – Vol. 30, Iss. 2. – P. 365-392. – URL:https://doi.org/10.1108/ECAM-08-2021-0732 EDN: https://elibrary.ru/YEJMHH
15. Liu, Y., Chang, R.-D., Zuo, J., Xiong, F., Dong, N. What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders / Y. Liu, R.-D. Chang, J. Zuo, F. Xiong, N. Dong // Engineering, Construction and Architectural Management. – 2023. – Vol. 30, Iss. 2. – P. 805-832. – URL: https://doi.org/10.1108/ECAM-06-2021-0538 EDN: https://elibrary.ru/YFHPUH
16. Nesvold, E., Bratvold, R. B. Field Features Do Not Explain Greenfield Production Forecasting Bias / E. Nesvold, R. B. Bratvold // Society of Petroleum Engineers Journal. – 2022. – Vol. 28(2). – P. 1-18. – URL:https://www.researchgate.net/publication/366536274 DOI: https://doi.org/10.2118/212834-PA
17. Regona, M., Yigitcanlar, T., Xia, B., Li, R. Y. M., Opportunities and Adoption Challenges of AI in the Construction Industry: A PRISMA Review / M. Regona, T. Yigitcanlar, B. Xia, R. Y. M. Li // Journal of Open Innovation: Technology, Market, and Complexity. – 2022. – Vol. 8, Iss. 1. – P. 45-49. – URL: .https://doi.org/10.3390/joitmc8010045 EDN: https://elibrary.ru/BOLWXB