1. Morozenko A.A. Improving the Efficiency of Organizational and Technological Solutions when Constructing Nuclear Power Plants on the Basis of Contemporary Russian and Foreign Experience / A.A. Morozenko, I.E. Voronkov.// Promyshlennoe i Grashdanscoe stroitelstvo. – 2014. – V. 10, – p. 74-79 (Rus). EDN: https://elibrary.ru/SWMCKF
2. Morozenko A.A. Scientific Approaches to Selecting the Assembly Block Configuration for VVER NPP Reactor Buildings / A.A. Morozenko, A.V. Baukin // Stroitelnoe proizvodstvo – 2025. – V. 2., – pp. 50-54 (Rus). DOI: https://doi.org/10.54950/26585340_2025_2_50; EDN: https://elibrary.ru/WHNYGQ
3. Korotkikh D.N. Review of Experience in the Construction of NPP Using Modular Structures with External Sheet Reinforcement / D.N. Korotkikh and other. // Vestnik MGSU. – 2024, – V. 10, – Pp. 1696-1712 (Rus). DOI: https://doi.org/10.22227/1997-0935.2024.10.1696-1712; EDN: https://elibrary.ru/AUFQZV
4. Morozenko A.A. Organizational and Technological Aspects of Large-scale Construction of Nuclear Power Plants. / A.A. Morozenko, A.A. Shashkov // Nauka i Business: puti razvitiya. – 2019. – V. 5, – pp. 28-33 (Rus). EDN: https://elibrary.ru/IFASBL EDN: https://elibrary.ru/YEMCPG
5. Dorf V.A. The Retained Steel Fiber Concrete Formwork as a Bearing Element of Ferroconcrete Structures / V.A. Dorf and other. // Severny region: nauka, obrazovanie, kultura. – 2015, – V.2. – 148-153 (Rus). EDN: https://elibrary.ru/VCTZED
6. Subbotin A.S. Possibility of Using Public-Private Partnership in the Construction of Thermal Power Plants. / A.S. Subbotin, D.S. Iashina // Novie technologii v stroitelstve. – 2024. – V. 1 – Pp. 29-33 (Rus). DOI: https://doi.org/10.24412/2409-4358-2024-1-29-33; EDN: https://elibrary.ru/UBASYU
7. Adam A. Aggregation of factors causing cost overruns and time delays in large public construction projects / A. Abderisak, P.-E. B. Josephson,G. Lindahl. // Engineering, Construction and Architectural Management. – 2017 – V. 24, Issue 3, – Pp. 393-406. – https://doi.org/10.1108/ECAM-09-2015-0135.
8. Durdyev S. Causes of delays on construction projects: a comprehensive list Available to Purchase / S. Durdyev, M. R. Hosseini // International Journal of Managing Projects in Business – 2020 – 13 (1): – Pp. 20–46. – https://doi.org/10.1108/IJMPB-09-2018-0178.
9. Sovacool B.K. Beyond economies of scale: Learning from construction cost overrun risks and time delays in global energy infrastructure projects / B. K. Sovacool, H. Ryu. // Energy Research & Social Science. – 2025 – V. 123. – 104057. – https://doi.org/10.1016/j.erss.2025.104057.
10. Fouladvand J. Infrastructure and governance: Prioritizing energy security dimensions for community energy systems. / J. Fouladvand, Y. Sarı, A. Ghorbani.// Energy Research & Social Science. – 2024 – V. 116. – 103676. – https://doi.org/10.1016/j.erss.2024.103676.
11. Sovacool B.K. An international comparative assessment of construction cost overruns for electricity infrastructure. / B. K. Sovacool, A. Gilbert, D. Nugent // Energy Research & Social Science. – 2014 – V. 3. – Pp. 152-160. – https://doi.org/10.1016/j.erss.2014.07.016.
12. Park J.E. Schedule delays of major projects: what should we do about it? / J. Eun. Park // Transport Reviews –2021. – V. 41, – Issue 6, – Pages 814-832. – https://doi.org/10.1080/01441647.2021.1915897 EDN: https://elibrary.ru/FDEXLW
13. Lyons R.C. Time to build: Rules-based planning and construction project duration in Dublin / Ronan C. Lyons, Éamonn Sweeney. // Journal of Housing Economics. – 2025. – https://doi.org/10.1016/j.jhe.2025.102089. EDN: https://elibrary.ru/JPOSQL
14. Gandhi S. Too slow for the urban march: Litigations and the real estate market in Mumbai, India. / S. Gandhi, V. Tandel, A. Tabarrok, S. Ravi // Journal of Urban Economics. – 2021 – V. 123. – 103330. – https://doi.org/10.1016/j.jue.2021.103330. EDN: https://elibrary.ru/YDICRD
15. Gilbert A. Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal / A. Gilbert, B. K. Sovacool, P. Johnstone, A. Stirling. // Energy Policy, – 2017 – V. 102. – Pp. 644-649. – https://doi.org/10.1016/j.enpol.2016.04.001.
16. Wheatley S. Reassessing the safety of nuclear power / S. Wheatley, B. K. Sovacool, D. Sornette // Energy Research & Social Science. – 2016 – V. 15 – Pp. 96-100. – https://doi.org/10.1016/j.erss.2015.12.026.
17. Pavlov A. S. Time Reservation during Construction of Large-scale Projects / A.S. Pavlov, R.V. Ostrovsky // Construction and Architecture. – 2024 – V. 12, No 2. – DOIhttps://doi.org/10.29039/2308-0191-2024-12-2-3-3 (Rus). EDN: https://elibrary.ru/MHATEP
18. Al-Tameemi Kh. Sh. The Impact of Schedule Compression Techniques on Construction Project Timelines: A Case Study in Basrah, Iraq. / Kh. Sh. Al-Tameemi // The Open Civil Engineering Journal. – 2025 – V. 19. – https://doi.org/10.2174/0118741495360335241205110710. EDN: https://elibrary.ru/HYAYZC
19. Ballesteros-Pérez P. Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking / P. Ballesteros-Pérez, K. M. Elamrousy, C. González-Cruz // Automation in Construction. – 2019 – V. 97 – Pp. 229-240. – https://doi.org/10.1016/j.autcon.2018.11.001.
20. Ardahsasta N. Schedule optimization of construction project by calculating float loss cost Available to Purchase. / N. Ardahsasta, O. Gondokusumo // AIP Conference Proceedings. – 2023 – 2680, 020035 (2023). – https://doi.org/10.1063/5.0126133.